Send Message
Home ProductsCompact Wastewater Treatment Plant

Energy Saving Integrated Compact Wastewater Treatment Plant 50m3/D

Certification
China Chengdu Yuanjin Environmental Engineering Co., Ltd. certification
China Chengdu Yuanjin Environmental Engineering Co., Ltd. certification
Customer Reviews
good quality good service

—— Mike

It is a professional water treatment company

—— Harry

Professional team, high-quality service

—— Julie

The treatment effect is stable and meets the standards, and the goods are genuine and affordable

—— Jayden

Affordable price and stable operation

—— James

Advanced equipment, stable results, and trustworthy

—— Carr

The integrated sewage treatment equipment has good treatment effect and stable operation, making it worth purchasing!

—— kolt

I'm Online Chat Now

Energy Saving Integrated Compact Wastewater Treatment Plant 50m3/D

Energy Saving Integrated Compact Wastewater Treatment Plant 50m3/D
Energy Saving Integrated Compact Wastewater Treatment Plant 50m3/D

Large Image :  Energy Saving Integrated Compact Wastewater Treatment Plant 50m3/D

Product Details:
Place of Origin: Chengdu, Sichuan
Brand Name: Yuanjin
Certification: ISO 9001, ISO 14001,CMA
Model Number: CD.Jin-5.0
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiatable
Packaging Details: Wooden box

Energy Saving Integrated Compact Wastewater Treatment Plant 50m3/D

Description
Product Name: Waste Water Treatment Machine Material: Carbon Steel
Application: Waste Water Treatment Capacity: 10-5000 M3/d
Color: White /Bule/Customized Origin: China
Control Mode: Automatic Power: Customized
Processing Capacity: Customized Treatment Effect: High
High Light:

50m3/D Sewage Treatment Equipment

,

Carbon Steel Sewage Treatment Equipment

,

Customized Wastewater Treatment Machine

Integrated Sewage Treatment Equipment

 

50m3/d Energy-Saving Integrated Sewage Treatment Equipment

 

Product introduction

 

The CD · Jin integrated sewage treatment reactor developed by our company is an efficient, energy-saving, and economical new generation integrated sewage treatment reactor mainly used for domestic sewage, hospital sewage, and industrial sewage treatment

 

Process flow

 

Energy Saving Integrated Compact Wastewater Treatment Plant 50m3/D 0

The sewage first passes through the sewage collection pipe to the septic tank for pre-treatment, and then enters the grid tank to intercept large garbage and suspended matter, and remove floating and large particle suspended impurities in the sewage; Then it enters the regulating tank. Under the action of the regulating tank, after the water quality and quantity are balanced, the sewage is pumped into the CD·JIN sewage comprehensive treatment reactor through the lifting pump.

 

 

The functional area of the integrated reactor for sewage treatment is a longitudinal ring structure. The sewage enters the primary zone through the lifting pump, and is effectively contacted through the water distribution system. After the treatment in the primary zone, the sewage rises into the secondary zone of the outer ring, which is equipped with a ring aeration biochemical system. The sludge and water are separated by a combination of physics and chemistry. The sludge in the third-level zone is continuously circulated to the first-level zone. Meanwhile, the flow rate control diffuser in the third-level zone can return part of the sewage to the first-level zone, and part of the sludge and water are separated. CD·Jin uses the three-way flow of upward flow in the outer ring, gravity flow in the inner ring and horizontal circulation, which can produce full mixing effect and ensure microbial activity. After the water is discharged from the third level area, it enters the main engine for further treatment. The main engine is equipped with contact disinfection area, equipment room and automatic control system, which is convenient for equipment maintenance and emergency treatment.

 

Specification and model

 

Energy Saving Integrated Compact Wastewater Treatment Plant 50m3/D 1

 

 

 

Contact Details
Chengdu Yuanjin Environmental Engineering Co., Ltd.

Contact Person: Ms. Jing

Tel: +86 17381899613

Send your inquiry directly to us (0 / 3000)